On March 31, 2022, DLC released the first draft of Grow Lamp V3.0 and the draft of Grow Lamp Sampling Policy. Grow light V3.0 is expected to take effect on January 2, 2023, and the plant light sampling inspection will begin on October 1, 2023.
1. Growing requirements for plant lighting effects (PPE)
Grow light V3.0 (Draft1) requires PPE to be greater than 2.3μmol/J (tolerance -5%)
2. Product Information Requirements
Grow Light V3.0 (Draft1) adds the following product information requirements that need to be stated on the product specification:
3. Requirements for product control capabilities
Grow Light V3.0 (Draft1) adds the requirement that the product must have dimming capability, as well as the description of the control function.
Dimming information (must have dimming function):
In addition, DLC also adds a variety of optional options for product information descriptions such as dimming and control functions, control properties, and receiving/transmitting hardware.
4. Plant Light Sampling Policy
Plant lamp V3.0 (Draft1) also adds a sampling inspection policy for plant lamp products. The specific requirements are as follows:
Table 1 Verification of product compliance
Table 2
Post time: May-21-2022